Planning a Winter Build: What to Order and When

Winter builds slip the same way every year. The season ends, the car comes apart, and the plan is to have it done by spring. Then it is February, parts are still on order, and the first test day is three weeks out.

The fix is simple. Pick the date you want the car on the ground, then count backward. Here is what to count.

Decide the cert before you buy anything

The cert level drives everything else: the tube, the bars, the floor, the price. Settle it first. Cage kits are final sale, so this is not the place to guess.

Be honest about where the car is going, not just where it is today. If there is a real chance it gets quicker in the next couple of seasons, tell us when you order. Roof bars and gussets are a lot less work before the cage is lifted into place than after.

Not sure which level you need? Start with Choosing the Right NHRA Cage for Your Drag Car and What Cert Do I Need? Then get the SFI chassis book for your spec and keep it open while you build. The 25.x specs have more than one configuration depending on where your helmet sits in relation to the main hoop, and the book is the spec your car gets certified to.

What each route takes

Cage kit. If it is not already on the shelf, it ships in two weeks. Freight runs $250 to $500 and the kit ships on a pallet so nothing gets bent or lost. Chromoly has to be TIG welded.

Cage kit with a welded floor structure. We assemble, fit and fully weld the floor structure here and ship it with the rest of your kit. Outside of peak season that adds one to three weeks. In winter, call for the current number.

Welded chassis. Built to order, up to eight weeks, with 50% down when the order is placed. It ships freight on a pallet or you can pick it up at the shop. Check the in-stock welded chassis list first. If yours is on it, you skip the wait.

In-house build. Every build starts with a planning meeting, an estimate and a deposit before the car goes on the schedule. Planning alone can take days to weeks. If you have a firm deadline, say so on the first call. Here is how the process works.

Count backward from your first race

Say the first test day is mid-March and you want the car done by the end of February.

A welded chassis ordered the first week of December can be up to eight weeks out. That puts it at your door around the end of January and leaves you about a month for everything else. That is tight.

A cage kit ordered the same week ships before Christmas. The tube is not the slow part. Your evenings are. Only you know how many of those you have between now and March, so plan around that number.

Winter is our busiest stretch. The earlier the order goes in, the more room you have when something else on the car takes longer than planned. Something always does.

Do the add-ons while the car is apart

The interior is out and the car is already torn down. This is the cheapest time to do the work that is hard to get to later.

Before the tube shows up

  • Get the interior out and get the car sitting level.
  • Line up the welder. If you ordered chromoly and you do not TIG, book the person who does now.
  • Know where your seat and helmet are going to sit. On a 25.x car that decides which configuration in the book applies.
  • Find your NHRA chassis inspector and ask how far out they are booking for spring.

Start with a phone call

Call 636-791-1541 and tell us about the car and the date you are working toward. We will tell you what is realistic. Or look at cage kits and welded chassis for your platform and see what is ready to order.